Skip to content

    Type to search. Enter opens all results.

    Projects

    Sites we have built and still look after

    Depots, car parks, hotels and corridors. Each one started with the same question: how long do the cars stay?

    Selected work

    Six sites

    Drag the row, or use the arrows.

    • Sample site Regional distribution centre Overnight AC for the vans, two DC bays for the lorries that turn round inside the hour. 48Bays 1.2 MWPeak load 9 weeksOn site
    • Sample site Motorway service area Twelve high-power bays behind a new grid connection, open around the clock. 12Bays 350 kWPer bay 24/7Open
    • Sample site Hotel and conference centre Slow charging where guests stay overnight, one fast charger by the entrance. 60Bays 22 kWAC 1DC bay
    • Sample site Retail park Thirty bays across three car parks, sharing one supply. 30Bays 3Car parks 1Supply
    • Sample site Council depot A fleet of refuse vehicles charging overnight on managed load. 24Bays 0 kWAdded to peak
    • Sample site Business park Employee charging on a shared supply, with a fast charger for visitors. 80Bays 7 kWPer bay 2DC bays

    Across every site

    What they have in common

    • 13weeks

      Typical programme

      From the first visit to live bays.

    • 99.5%

      Uptime target

      Measured monthly.

    • 24/7

      Monitoring

      Faults are seen before they are reported.

    • 1

      Point of contact

      Named on the contract.

    What clients say

    They told us what the supply could carry before they sold us a single charger. That is why the site still works.

    Sample client Facilities manager

    One point of contact from the survey to the handover. We never had to chase anyone.

    Sample client Operations director

    The bays were live a week before the date we were given.

    Sample client Site owner

    Have a site in mind?

    Send us the address and how the cars use it. We will come back with what we would measure first.

    Start the conversation